St. Anton Railway Station
Architecture: Manzl Ritsch Sandner (1999-2001) Builder-owner: ÖBB The centre of the village can be reached directly via a footbridge.
The double lane expansion of the Arlberg tunnel carried out in 1998 provided the chance to demolish the old railway station originally in the middle of the village and build a new one on the south side of the valley. The design, emerging from a Europe-wide contest, is a new interpretation of the "Railway Station”. The actual station building is not a solitary building away from the railway lines, but a part of the landscape designing process.