architek[tour] tirol – der architekturführer für tirol

Weiter zur mobilen Version von: architek[tour] tirol

konzert friedrich

Übersichtskarte ausblenden
1 building(s) found:
01

Städtisches Hallenbad (Municipal Indoor Pool)

Amraser Straße 3, 6020 Innsbruck, A
Architecture: Friedrich Konzert (1928) Builder-owner: Stadt Innsbruck Open to the public: during opening hours (entrance fee). In 2014, the roof construction of the indoor swimming pool was completely replaced, the original false ceiling with its numerous stucco elements recreated and the original coloring of the interior reconstructed.

The listed indoor pool was erected in the interwar years according to the plans of the City Building Director Friedrich Konzert, who, among other things, also planned the municipal steam baths in Salurnerstraße. It is characterized, on the one hand, by the functional composition of the structures, which is clearly legible from the outside. On the other hand, many allusions to Secessionism can still be found in the details. The heart of the swimming pool is the two-story hall, which features large windows on three sides and an encircling gallery.

© aut